Warehouse Upgrade and Move

I led the IT side of La-Z-Boy Southeast’s warehouse upgrade and relocation — bringing a new distribution center online with the network, systems, and physical security to run it, while keeping leadership updated on construction and coordinating every vendor and contractor along the way.

Moving the Engine Room

A distribution center is the engine of a furniture business — and this one had to move to a new building without losing a beat. New cabling, new systems, new security infrastructure, all against a construction schedule I didn’t control but had to plan around, while the current operation kept shipping.

Empty warehouse interior before fit-out

What I Delivered

Network equipment rack with cabling and power module

Infrastructure buildout

Specified and installed the low-voltage cabling and network infrastructure the new DC runs on.

Dome CCTV security camera close-up

Physical security

Designed and deployed badge access, cameras, and alarms to safeguard the facility.

Staff training session around conference tables

Accounts & training

Created user accounts with managers and ran training so the team moved in ready to work.

Commercial building under construction

Construction liaison

Kept contractors, vendors, and leadership aligned as construction progressed toward move-in.

Skills & Tools

The stack behind this build — tap any to see related work.

Kicked Off
0
Security Systems Deployed
0
Core Deliverables
0
Skills & Tools
0
Organized distribution-center warehouse shelving

The Impact

The new distribution center came online on schedule — wired, secured, and staffed with people trained on the new systems. The move happened without stalling the operation it exists to serve.

The Move That Didn't Stop the Business

A relocation only succeeds if customers never feel it. Planning the technology and security alongside the construction — not after it — is what let this DC change buildings without missing a shipment.

Have a project like this?

New building, live operation, working systems on move-in day — that’s the deliverable. Let’s talk about your move.

More Projects

Coding workstation with a laptop
Web Development & Platforms

JDSileo.com Redesign & Platform Revamp

A ground-up revamp of my own platform: 123 case studies elevated into one design system, 170 branded archives, and a one-page site with a scored intake and live Teams booking — built AI-assisted with Claude Code (Opus & Fable).

Read More »